Real Estate listings near Beare Road Landfill

The Beare Road Landfill was a landfill that operated in Scarborough, Ontario until 1983. The site is bounded by Finch Avenue East to the north, the Scarborough-Pickering Town Line to the east, CN Rail line to the west and hydro corridor to the south. Metropolitan Toronto opened the Beare Road Landfill Site in 1967 with the approval of Scarborough Council. The 80.5-hectare site, originally with a capacity of 3.3 million tonnes, received solid waste through 1988. Metro and Scarborough agreed to expand the Beare Landfill's capacity by 635,000 tonnes in 1971 and 5.4 million tonnes in 1974. Following closure of the landfill in 1983, the City continued to manage the site to control potential impacts. To limit emissions and control odours, the surface of the site was equipped with an array of passive candlestick gas flares. The City selected developed a landfill gas to electricity project at the Beare Road site. Construction of the LFG collection field and power plant proceeded and generation of electricity from LFG began in January 1996.